Laserfiche WebLink
System Wide Planning Approach <br />Master Plan <br />•Decade at Hayden Bridge and Raw Water Intakes <br />•Moving into the delivery system <br />Strategic Plan <br />•Emergency Preparedness & Disaster Recovery (“Resilient Spine”) <br />•Safe, Reliable, Responsible, Community <br />Capital Improvement Plan: <br />•Emergency Water Sites (5 Sites/5 Years) <br />•Strengthening our transmission system <br />•Replacing College Hill (by 2023) and Hawkins <br />•Constructing new storage at E. 40th Ave site <br />•Decommissioning Santa Clara Pump Station and Reservoir <br />Water Capital Overview Eugene Water & Electric Board <br />Emergency Well Drilling <br />–Sheldon Fire Station <br />Hawkins Hill Reservoir