Laserfiche WebLink
Performance Life Safety “Life Safety plus”Immediate Occupancy Operational <br />•Safe exit <br />•Structure may be <br />compromised <br />•Rebuilding may be cost- <br />effective option <br />•Limited damage to <br />Structure & Envelope <br />•MEP likely to sustain some <br />damage <br />•Most damage should be <br />repairable <br />•Operations should resume <br />after repairs <br />•Minimal damage to <br />Structure, MEP & Envelope <br />•All damage should be <br />repairable <br />•Operations should quickly <br />resume <br />Cost Difference Baseline + $1,050,000 –1,650,000 + $2,250,000 –3,250,000 <br />13 <br />new hybrid option