Laserfiche WebLink
Current SDC <br />Reductions for <br />ADUs <br />Fee ADU Fee <br />(800 sq. ft) <br />Reduction Reduction <br />Cap <br />Single Family <br />(1,500 sq. ft) <br />Transportation <br />SDC <br />$1,701 100% Fee <br />Reduction <br />$40k/yr $3,272 <br />Parks SDC <br />(Current) <br />(Proposed) <br />$3,492 <br />$3,035 <br />n/a <br />n/a <br />n/a <br />n/a <br />$4308 <br />$4,740 <br />Stormwater SDC $427 n/a n/a $688 <br />Local <br />Wastewater SDC <br />$552 n/a n/a $649 <br />Regional <br />Wastewater SDC <br />$1,528 14% <br />reduction for <br />homes ≤800 <br />sqft <br />$100k total, <br />sunsets on <br />July 1, 2020. <br />$1780 <br />EWEB SDC $758 66.69% <br />reduction for <br />ADUs <br />n/a $2276