<br />other parameter not represented by BOD or 1SS such as screenings, grit, or pathogens? <br />These questions are answered by the functional performance component. The design basis <br />co~~ders what system capacity parameter or combination of parameters drives the sizing of <br />the facility and, therefore; the constructed cost. The allocation basis for each,facility <br />, component presented in. Table 3 combines both the functional performance and design basis <br />considerations. In addition. to these system parameters, because there can be proj-ec:;ts'that <br />provide overall support-for the wastewater system, a separate catego~ of lIindirect" <br />, support facilities is used to provide for reallocation of these support-type, costs across all of <br />the system capacity parameters. ' <br /> <br />TABLE 3 <br />Summary of Facility Process Component Allocation to System Capacity Parameters <br /> <br /> System Capacity 'Parameter <br /> Average Peak <br />Facility Process Component Flow Flow BOD TSS Indirect Total <br />Collection system pipeline % ~ 1 <br />Collection system pump stations % ~ 1 <br />Preliminary treatment % ~. 1 <br />Primary treatment % % % '1 <br />Secon~ary treatment % % % 1 <br />Disinfection/outfall % ~ l' , <br />Biosolids (same for all three subcomponents) % % - 1 <br />Tertiary fjlters % % % 1 <br />Reuse ,facilities 1 1 <br />Odor control % % 1 <br />Peak flow management 1 1 <br />Support facilities (Indirects) 1 1 <br /> <br />Step Two · ,Growth Capacity Requirements <br /> <br />In developing SDCs, costs related..to growth (see 'Cost Basis' below) ,are spread over <br />, growth's total ,capacity requirements over the study period to determine the overall cost per <br />unit of growth by capacity measure. The, study period is defiited asa 20-year period, <br />consistent with facility planning requirements. The Department of Environmental Quality <br />(DEQ) stipulates that entities that own and operate wastewater facilities assume a 20-year <br />pla.mUng horizon when developing facility plans (see DEQ Guidance for Development of <br />Wastewater Facilities Plans, 20(0). <br /> <br />To determine the capacity required by growth, the capacity required by exi~ting users is <br />subtracted from the capac;ity projected in the facility plan to be required at the end of the <br />planning period. For peak flow estimates, existing users' current capacity requirements are <br />adjusted for anticipated III reductions (see Guidelines for the Preparation of Facilities PlanS <br />and Environmental Reports for Community Wastewater Projects, 1999). <br />