Laserfiche WebLink
<br />flows. Also, the~e are facilities such as the dry weather headworks where a portion of their <br />function or design criteria sizing is based on peak . flow. <br /> <br />The peak flow management category is allocated; entirely to peak flow, as both the ongoing <br />function and the sizing design criteria sizing are based solely on peak flow. <br /> <br />. Peak Flow - 100 percent <br /> <br />SuPP.ort Facilities (Indirects) <br /> <br />The support facilities ~r in<lli~ category captures certain types of treatment plant facilities <br />that serve multiple functions~ such as the labora~ory, land acquisiijon, and instrumentation <br />and control systems. CostS of 9tese types.ofJacilitiesare allocated across the other <br />11.components in proportion to the weighted average allocation percentages.~or the <br />reimbursement fee, the weighted average reflects th~ direct allocation of existing asset costs <br />to the 11 facility components. For the improvement fee, the weighted average reflects the <br />allo.cation of the 20-year proJect list to the 11 facility components. <br /> <br />. Support facilities. allocated proportionally to the other 11 facility components. <br /> <br />(" <br /> <br />( <br /> <br />A-26 . ' <br />