My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 04/09/07 Meeting
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:40 PM
Creation date
4/6/2007 9:11:54 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />> Street light costs <br /> <br />> Bridge and other structure construction costs <br /> <br />· Off-street bicycle paths <br /> <br />> Bicycle path construction costs <br /> <br />> Bicycle path light costs <br /> <br />The cost impacts of new development on these components are allocated on the basis of p.m. <br />peak hour traffic on adjacent streets using either the trips specified in the Standard Calculation or <br />based upon an Alternate Calculation as set forth in Appendix B. <br /> <br />The detailed Cost of Service formula as well as the cost per trip for each component of the <br />transportation system is set forth in Appendix B. The cost per trip is the sum of all transportation <br />system components identified in Appendix B. <br /> <br />The transportation SDC for a proposed development is determined by multiplying the units which <br />describe the impact by the trip rate (to determine the number of trips assigned to the proposed <br />development) using the Transportation Trip Rates table in Appendix B and the cost per trip in the <br />current adopted SDC fee schedule in Appendix F. <br /> <br />4.0 Local (City) and Regional Metropolitan Wastewater Management Commission <br />(MWMC) Regional Wastewater Systems <br /> <br />Collection of the wastewater SDC includes both a local (City) and regional (MWMC) system <br />charge. <br /> <br />4.1 Local Wastewater System <br /> <br />The local wastewater SDC is based upon estimated wastewater flow discharge (impact on <br />and/or use of system capacity) from various development types. A unit cost of capacity in <br />terms of cost per gallon per day is established and used to determine SDC rates. For <br />residential development the rate is based on number of dwelling units and area of living <br />space. For nonresidential development the rate is based on number of PFUs and the <br />proposed development type. The detailed analysis, methods for calculating, and the Cost <br />of Service formula for the local wastewater system can be found in Appendix C. The local <br />wastewater SDC rates can be found in the current adopted fee schedule in Appendix F. <br /> <br />The local wastewater SDC for a proposed development is determined by: <br /> <br />. Number of Residential Dwelling Units (RDU) and area of living space for single- <br />family, duplex, multiple-family, and other residential development <br /> <br />. Plumbing Fixture Units (PFU) and proposed development type for other than <br />Residential Dwelling Units (e.g., recreation center, convenience market). <br /> <br />City of Eugene SDc Methodologies <br />
The URL can be used to link to this page
Your browser does not support the video tag.