My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 04/09/07 Meeting
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:40 PM
Creation date
4/6/2007 9:11:54 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 2 <br /> <br />Potential Impact Reduction and Credits for Systems Development Charges <br /> <br />NOTE: <br /> <br />These are possible examples only; eligibility is established at time of <br />review of plans which approve the proposed improvements. <br /> <br />II 1. Tran$~ortati()n S~$tern II <br /> <br />REDUCTIONS: <br />Successful bus pass program for employees <br /> <br />CREDITS: <br />Street width in excess of assessable width <br />Off-site, non-contiguous arterial or collector intersection <br />Street light on arterial or collector street <br />Off-site arterial or collector right of way and easement acquisition <br />Traffic signal on arterial or collector street <br />Off-street bicycle paths identified in adopted City plan <br />Off-site eligible public improvements where equivalent assessments can be collected <br /> <br />2. Wastewatersystern <br /> <br />CREDITS: <br />Public Wastewater collection lines> 8-inch diameter <br />Public pump stations and pressure lines that serve more than the development <br />Off-site public improvements, where equivalent assessments can be collected <br />Prior payment of Metropolitan Wastewater Service District debt service <br /> <br />II <br /> <br />3. Slormwater System <br /> <br />REDUCTIONS: <br />Destination and Quantity: Reduction or elimination by retention of stormwater otherwise <br />discharged into public system <br />Pollution: Reduction of pollution via approved treatment techniques <br /> <br />CREDITS: <br />Stormwater collection lines > 24-inches in diameter <br />Major drainage channels: construction and off-site easement <br />Off-site public improvements where equivalent assessments can be collected or that <br />benefit existing developments <br /> <br />II <br /> <br />II <br /> <br />4. Parks System <br /> <br />CREDITS: <br />Land dedication (for sites accepted by City, consistent with adopted City plans) <br />On-site park facility dedication (for improvements accepted by City, consistent with <br />adopted City plans) <br /> <br />II <br /> <br />City of Eugene SDc Meth~dologies <br />
The URL can be used to link to this page
Your browser does not support the video tag.