My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 04/09/07 Meeting
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:40 PM
Creation date
4/6/2007 9:11:54 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The total street SDC is allocated between the reimbursement and improvement <br />fees as follows: <br /> <br />Reimbursement SDC = <br /> <br />Cost per Trip (existing system) X Capacity % (existing system) <br /> <br />Improvement SDC = <br /> <br />Cost per Trip (future system) X Capacity % (future system) <br /> <br />1.2 Off-Street Bicycle Path Component <br /> <br />1.2.1 Formula <br /> <br />The off-street bicycle path component is determined based on the average cost <br />of off-street bicycle path per person and the estimated vehicle trips per person. <br />The SDC calculation under a LOS approach is represented by the following <br />formulas: <br /> <br />Cost per Trip = A veraae Off-Street Bicvcle Path Cost Per Person <br /> <br />Average Vehicle Trips per Person <br /> <br />1.2.2 Step 1 - Determine SDC cost basis <br />The off-street bicycle path component of the SDC is based on maintaining an <br />existing standard number of miles of path per thousand persons. The cost per <br />mile of off-street bicycle path is added to the cost per mile for off-street bicycle <br />path lighting and the total is divided by the population to derive ~ per person cost. <br /> <br />. Off-Street Bicycle Paths <br /> <br />~ Path Construction Costs <br /> <br />~ Path Light Costs <br /> <br />1.2.3 Step 2 - Determine System Capacity <br />Off-street bicycle capacity is defined as the average vehicle trips per person. <br />Based on path inventory and population data, the average vehicle trips per <br />person is 0.895. In order to provide a uniform basis for the SDC, per capita is <br />converted to per vehicle trip using the average number of vehicle trips per <br />person. <br /> <br />1.2.4 Step 3 - Determine Unit Cost of Capacity <br /> <br />The off-street bicycle component unit cost of capacity is calculated as follows: <br /> <br />Cost per Trip (unit cost of capacity) = <br /> <br />Average Off-Street Bicycle Path Cost Per Person (cost basis) X <br /> <br />Average Vehicle Trips per Person (system capacity) <br /> <br />Because the current standard level of service is based on current inventory and <br />population, no "excess'" bike path capacity is considered to exist, so the entire <br />fee is characterized as an improvement fee. <br /> <br />City of Eugene SDc Methodologies <br /> <br />Transportation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.