Laserfiche WebLink
<br /> <br />Ex~~tin9J:)ark Service Areas <br />Population <br />perce!!!~ge of total pgpulC!t!()n served <br />Existing Acreage Allocation - Acquisition <br />Existin Acrea e Allocation -- Development <br />Expanded & Future Service Areas <br />Population <br />Percentage of total population served <br />future Acre~g~_~II()cation - ~cq~isition <br />Future Acreage Allocation - Development <br /> <br />86,415 <br />81% <br />170.6 <br />77.6 <br /> <br />19,764 <br />19%: <br />m-t-- <br />40.0: <br />18.21 <br /> <br />23,669 <br />51% <br />26.5 <br />-- ------------- <br />38.352 <br /> <br />22,528. <br />49% <br />25.5 <br />36-.848 ;------- <br /> <br />Total <br /> <br />106,179 <br />100% <br />210.6 <br />95.8 <br /> <br />46,197 <br />100% <br />52.0 <br />75.2 <br /> <br />1.2 Determine the sDC Cost Basis <br /> <br />Development of the SDC cost basis involves allocation of planned park and facility <br />acquisition and improvements (and associated costs) and the portions of existing park <br />system capacity serving growth to future park users in proportion to their relative need, as <br />determined by the capacity analysis. The cost basis includes all park types: neighborhood <br />parks, community parks, natural areas, urban plazas, metropolitan parks, linear parks, and <br />special use facilities, within the City's park system1. <br /> <br />1.2.1 Reimbursement Fee <br /> <br />For the reimbursement fee, the cost basis is the sum of the value of the existing <br />system inventory that will serve growth. The land and facilities are valued based on <br />current replacement costs. The cost basis is adjusted for historical funding from <br />external sources (Le., grants and contributions). Only the portions of existing parks <br />funded through city funding sources are included in the cost basis. Tables 10 <br />through 13 show the quantity of existing land and facilities by type that are assumed <br />to be required for growth's capacity needs. The reimbursement fee cost basis is <br />shown in Table 13. <br /> <br />1.2.2 Improvement Fee <br /> <br />For the improvement fee, the cost basis is the sum of growth's share of individual <br />projects from the Project List (with the exception of priority 5 projects). The project <br />list represents the community's desired level of service over the planning period, as <br />articulated through the PROS Comprehensive Plan development process. Projects <br />or portions of projects that are (a) identified as "renovation" in the Project Plan, <br />and/or (b) estimated to be funded through other City or non-City funds, are excluded <br />from the cost basis. <br /> <br />Table 14, derived from the Project List, shows the improvement fee cost basis. <br /> <br />1 The parks system includes some existing and planned park acres outside the urban growth boundary (UGB). These are included <br />in the SDC cost basis, consistent with applicable law and in order to fully recover growth's costs of capacity; parks outside of the <br />UGB were included in the planned LOS established by the community through the PROS planning process. <br /> <br />City of Eugene SDC Methodologies <br /> <br />Parks. <br />