My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4900
COE
>
City of Eugene
>
Resolutions
>
2007 No. 4898-4922
>
Resolution No. 4900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:50:21 PM
Creation date
4/13/2007 12:06:53 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
4/9/2007
Document_Number
4900
CMO_Effective_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Biosolids facilities at the WPCF and the BMF are both sized and function to treat the BOD <br />and TSS removed during the treatment process; therefore, their allocation is split equally <br />between BOD and TSS. <br /> <br />· BOD -1/2 <br />· . TSS-1/2 <br /> <br />Tertiary Filters <br /> <br />The existing WPCF does not have tertiary filters. The 20-year project list recommends that <br />tertiary filters be installed to enable the WPCF to consistently meet the NPDES permit <br />discharge requirements. The permit includes mass limits for BOD and TSS. As influent <br />flows to the WPCF increase in the future, the effluent concentration required to meet the <br />mass limits decreases. Addi~on of the filters will assist with meeting these more stringent <br />effluent concentrations. From a functional basis, the main purpose of the filters is to remove <br />TSS, andto a lesser degree BOD. From a design criteria sizing basis, average flow is used to <br />determine the size of the facilities. In the wet weather season, a portion of the peak flow <br />may be routed to the filters for ,pdditional treatment. However, the associated peak flow <br />loading rate onto the filters will not be the limiting factor in terms of design criteria sizing~ <br />Following is the allocation for the tertiary filter treatment category: <br /> <br />· Average Flow -1/4 <br />· BOD - 1/4 <br />· TSS-1/2 <br /> <br />Reuse Facilities <br /> <br />Reuse facilities may be constructed to comply with more stringent regulatory requirements <br />related to temperature andlor thermal load restrictions of Willamette River discharges. <br />Reuse facilities would allow flow to be diverted from the river by reusing plant effluent for <br />irrigation. The basic design criterion used ~o size reuse facilities is average flow; so this <br />parameter receives 100 percent of the allocation. <br /> <br />· Average Flow - 100 percent <br /> <br />Odor Control <br /> <br />Odor control facilities function by collecting odorous air from preliminary I primary liquids <br />treatment processes and biosolids treatment/handling processes and treating the air to <br />remove the odors. Odor generation is dependent on the influent loading levels and, <br />therefore, the allocation is split equally between BOD and TSS because both parameters <br />contribute to the sizing and function of the odor control systems. <br /> <br />. BOD - 1/2 <br />. TSS - 1/2 <br /> <br />Peak Flow Management <br /> <br />There are a number of future capital improvement projects that specifically function to <br />convey, treat, and discharge the wet season peak flow. For example, the parallel <br />primary / secondary peak flow management approach is proposed s,olely to address peak <br /> <br />A-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.