My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4900
COE
>
City of Eugene
>
Resolutions
>
2007 No. 4898-4922
>
Resolution No. 4900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:50:21 PM
Creation date
4/13/2007 12:06:53 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
4/9/2007
Document_Number
4900
CMO_Effective_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The projected 2025 average TSS is determined as follows: <br /> <br />Projected 2025 TSS = (0.205 * 297,585 * 1.4) + 2,224 = 87,600 mgd (actual calculated value of <br />87,631lbsl day) rounded to the nearest hundred pounds) <br /> <br />Where: <br /> <br />0.205 is the selected pounds per capita per day (Ppcd) based on dry season <br />values from 1990 to 2002 <br /> <br />297,585 is the projected population to be served in 2025 <br /> <br />1.4 is the selected peaking to convert average dry season load to DSMM load <br />(based on 1990 to 2002 data) <br /> <br />2,224 is the projected industrial TSS load in lbsl day (it has been assumed that the <br />industrial load will remain constant over the study period) <br /> <br />The required capacity to meet the needs of growth in terms of TSS is 22,900 lbsl day <br />(87,600 - 64,700). <br /> <br />Biosolids Treatment <br /> <br />The three subcategories used to allocate biosolids treatment, handling, and disposall reuse <br />costs for purposes of SDC calculations are: <br /> <br />. .General <br />· Dewatering <br />. Biocycle farm <br /> <br />Table C-3 presents a capacity summary of the MWMC biosolids facilities. <br /> <br />TABLE C-3 <br />Capacity Summary of MWMC Biosolids Facilities (annual average dry tons per year) <br /> <br /> Subcomponents <br /> General Dewatering Biocycle Farm <br />Existing capacity 5,869 7,000 2,811 <br />Current loading (current capacity required) 5,869 5,869 2,811 <br />Available capacity None 1,131 None <br />Available capacity (%) 0% 16.2% 0% <br />Projected 2025 loading (future capacity required) 8,600 7,000 3,612 <br />Growth loading 2,731 1,131 801 <br />Required Capacity Expansion 2,731 None 801 <br />Growth share of 2025 load 31.8% 16.2% 22.2% <br />Growth shar.e of capacity expansion 100% 0% 100% <br /> <br />A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.