My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: West Broadway Project Update
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 04/25/07 Work Session
>
Item B: West Broadway Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:17:28 PM
Creation date
4/19/2007 8:40:17 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sustainable building materials, operable Reuse of existing Centre Court and Washburne <br /> <br />?? <br />windows buildings <br />Improved energy efficiency, green roofs, Project will include green elements in design <br /> <br />?? <br />stormwater retention and construction: green roofs, sun shading, <br />No LEED certification intended storm water retention, sustainable building <br /> <br />? <br /> materials, low E windows, insulation <br />exceeding code requirements, energy efficient <br />appliances <br />Goal for LEED certification on some <br /> <br />? <br />buildings, particularly Centre Court <br /> <br /> <br /> Parking Requirements <br />BEAM KWG <br /> <br />15 new surface spaces added with new Estimated parking needs: <br />construction, plus utilization of existing parking New 600 spaces <br /> Existing 1,000 spaces <br /> Total 1,600 spaces <br /> <br /> <br />?Grocer and retail need 4 spaces per 1,000 feet <br /> <br />?Theatre needs 1 space for every 3 seats <br /> <br />?Condos need 1 space per unit <br /> <br />?Rental housing needs 0.75 spaces per unit <br /> <br />?Hotel to use new and existing spaces <br /> <br /> <br />Feasibility of Building Reuse <br />BEAM KWG <br /> <br />Initial investigation suggests renovation possible. Extensive structural and programmatic analysis is <br />Additional site work is necessary to determine required to determine actual costs and work <br />feasibility of building reuse. required. An increased cost estimate has been <br />factored in to address this issue. <br /> <br /> <br /> Preservation of Centre Court and Washburne Buildings <br />BEAM KWG <br /> <br />Both Centre Court and Washburne buildings are Centre Court building is planned to be <br />planned to be rehabilitated for retail and office rehabilitated into a high end, boutique hotel. Per <br />uses. community’s expressed interest, Washburne <br />building will also be retained and renovated for <br />retail and office. <br /> <br /> <br />L:\CMO\2007 Council Agendas\M070425\S070425B.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.