My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: URA - West Broadway Preliminary Financing Plan
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 05/29/07 Work Session
>
Item B: URA - West Broadway Preliminary Financing Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:17:14 PM
Creation date
5/24/2007 9:26:17 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rehabilitation <br /> Encourage repair and rehabilitation of existing buildings within the project <br />area through grants and low-interest loan programs. <br />Section 500 – Land Use Plan <br />The use and development of all land within the Central Eugene ProjectDowntown Urban <br />Renewal District Plan area shall comply with the regulations prescribed in the City’s <br />comprehensive plan, zoning ordinance, subdivision ordinance, City charter, or any other <br />applicable local, State or Federal laws regulating the use of property within an urban <br />renewal area. <br />Section 600 – Project Activities <br />In order to achieve the objectives of this plan, the following activities may be undertaken <br />on behalf of the City of Eugene by the Renewal Agency, in accordance with applicable <br />Federal, State, County, and City laws, policies, and procedures. <br />A. PUBLIC IMPROVEMENTS <br />. <br />1Street, Curb, and Sidewalk Improvements <br />Improvements within the renewal area may require the construction of new <br />street, curb, sidewalks or sidewalk improvements, such as widening, within the <br />plan area. The Renewal Agency may participate in funding sidewalk and <br />roadway improvements including design, redesign, construction, resurfacing, <br />repair and acquisition of right-of way for curbs, streets, and sidewalks, and <br />pedestrian and bicycle paths. Projects to be undertaken include, but are not <br />limited to: <br /> Local street, curb, and sidewalk improvements identified in the Eugene <br />Capital Improvements Program (CIP), the Vision For a Greater Downtown <br />Eugene Report, and the Courthouse District Concept Plan. <br /> Other curb, sidewalk and street improvements identified by the Renewal <br />Agency. <br />. <br />2Public Utilities <br />The development proposed for the renewal area may require the replacement <br />environmental <br />and construction of water, storm and sanitary sewer facilities, and <br />mitigations. These improvements may include, but are not limited to: <br /> Sanitary sewer, water, and storm water system upgrades & replacements <br />identified in Eugene Capital Improvements Program <br />Urban Renewal Plan For Central Eugene Draft of May 2007 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.