Laserfiche WebLink
ATTACHMENT A <br />right-of-way at the property owner's risk and subject to the following <br />conditions and requirements. <br />(a) Adequate plans and specifications for the proposed installation <br />are submitted to the city engineer. <br />(b) Conditions approved by the city engineer shall be attached to and <br />made a part of the application and plans. <br />(c) That the structures comply with the applicable codes or <br />ordinances of the city with regard to structural safety, sanitation, <br />setback, and fire safety requirements. <br />(d) That the requests be evaluated by the city engineer in regard to <br />any adverse effect on adjoining properties. <br />(e) That there be no interference with the use of the public street for <br />roadway, walkway, existing or proposed utilities and other <br />authorized uses. <br />(f) That said permit shall be revocable by the city on demand except <br />in the case of oversize curb cuts. <br />(g) All plantings shall be first approved by the city manager or <br />designee. <br />(h) The form of permit shall be approved by the city attorney. <br />(i) A fee for the permit shall be charged to the applicant as set by <br />the city manager under section 2.020 of this code[ based on <br />the same valuations of the work to be performed in the public <br />right-of-way as specified for building permits under applicable <br />ordinances]. <br />(j) The applicant shall agree to the foregoing conditions for the <br />approval of said permit. <br /> <br /> <br />Section 32. <br /> Subsections (1) and (2) of Section 7.720 of the Eugene Code, 1971, <br />is amended to provide: <br />7.720 SDC - Collection of Charge <br />. <br />(1) <br /> After adoption of the applicable methodology, a systems development <br />charge is payable upon issuance of: <br />(a) A building permit; <br />(b) A development permit for development not requiring the issuance <br />of a building permit; or <br />(c) A permit to connect to the water, wastewater sewer or stormwater <br />[sewer systems] management facilities or in anticipation of the <br />issuance of such a permit at the time of levying a local <br />improvement district assessment for wastewater sewer or <br />stormwater [sewer] management facility. <br />(2) <br /> If development is commenced without an appropriate permit or <br />connection is made to the water system, wastewater sewer system or <br />stormwater [sewer system] management facility without an <br />Ordinance - <br />23 <br /> <br />