My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Newsletter - 06/21/07
COE
>
City of Eugene
>
Council Newsletters
>
2007
>
City Council Newsletter - 06/21/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:54 PM
Creation date
6/21/2007 2:37:49 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Council Newsletter
CMO_Meeting_Date
6/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />? <br /> Time Bandits, rated PG, on Friday, July 13, at Amazon Park, 2700 Hilyard Street <br />? <br /> Ghost Busters, rated PG, on Friday, July 27, at Monroe Park, 10th and Monroe <br />? <br /> My Neighbor Totoro, rated G, on Friday, August 3, at Washington Park, 19th and Washington <br />? <br /> Akeelah and the Bee, rated PG, on Friday, August 10, at Churchill Skate Park, next to Churchill High <br /> School on Bailey Hill <br />? <br /> The Incredibles, rated PG, on Friday, August 24, shown in Spanish at Petersen Barn, 870 Berntzen <br /> Road <br /> <br />The movie schedule is subject to weather and availability. For more information, call Lizz Zitron at <br />682-5521. <br /> <br />Work Continues on Project to Repair Portion of North Bank Trail <br />Work on the North Bank Trail has reached a significant <br />milestone, but cyclists and pedestrians will need to be <br />patient for another month as construction continues. <br /> <br />The popular bike and pedestrian route has been closed <br />since early May to allow crews to repair a 1.5-mile-long <br />section of the Ruth Bascom Riverbank Trail between the <br />Greenway Bridge at Valley River Center and Club Road <br />near the Ferry Street Bridge. Wildish Construction Co, the <br />general contractor on the $785,000 path resurfacing <br />project, has now finished the concrete overlay portion of <br />the repairs. The overlay took 180 loads of concrete <br />totaling almost 2,000 cubic yards. <br /> <br />The next steps include backfilling the shoulder areas next <br />Workers install concrete overlay on North Bank Trail <br />to the path with top soil and replacing and installing 3,000 <br />feet of railing that protects path users from steep drop-offs into the Willamette River. For safety reasons, <br />the path will remain closed until the railing work has been substantially completed in late July. <br /> <br />While the path is closed, cyclists and pedestrians can use the South Bank Trail on the other side of the <br />river as a detour route. The Greenway Bridge and the DeFazio Bridge remain open to allow path users <br />to cross the river on either end of the construction. For more information about the North Bank Trail <br />project, contact Project Manager Jenifer Willer at 682-5364. <br /> <br />EUGENE CITY COUNCIL NEWSLETTER PAGE 4 <br />June 21, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.