Laserfiche WebLink
Previous research on Potential City Hall Sites <br />A site for a new city hall was the focus of two Community Forums held in 2006. Forum #3 involved an <br />extensive examination of more than 25 sites. Forum #4 examined how the concept designs worked on the <br />two sites forwarded by Council, the Rock N’ Rodeo/ Butterfly Lot site and the Existing City Hall site. <br /> <br />Close to 100 people attended Community Forum #3 on August 24, 2006 to discuss potential sites for a <br />new Eugene City Hall Complex. Twenty-five downtown sites were examined by the Forum participants <br />after a presentation of criteria and factors to consider (a map of all 25 sites is included at the end of this <br />attachment along with the tally of support for each; to review the criteria and factors for the sites, refer to <br />the Forum #3 presentation available on the project website at www.eugenecityhall.com). Forum <br />participants expressed strong preference for a full-block site over a half-block site. Reasons included <br />wanting a lower-scale building, space for horizontal expansion, more open space, and better potential for <br />sustainable design. <br /> <br />In addition to the 25 sites examined, the group requested that an additional site (combination of #17 <br />Broadway/ Charnelton & #19 former Sears) be added for group consideration as Site #26. By request <br />th <br />near the end of the forum another vote was taken on a combination of sites #3 (6 / Willamette) & #4 <br />(County Health Building), called Site #27, that resulted in nominal support by a show of hands (a count <br />by clicker technology could not be established on site #27 due to technological constraints). Three sites <br />were clearly ranked above all others to carry forward into concept design with each receiving over 50 <br />votes (the next highest grouping received votes in the 30’s). The sites that received the most support <br />were: <br /> <br />Site #9 (existing City Hall) 54 carry forward 19 remove <br />Site #8 (Rock N’ Rodeo/Butterfly Lot) 54 carry forward 20 remove <br />Site #26 (Broadway/ Charnelton & former Sears) 52 carry forward 21 remove <br /> <br />In the fall of 2006, Site #26 became the subject of a multi-use development project. Because the site was <br />being reserved for this purpose, the Project Team explored concept options on the other two sites (#8 and <br />#9). At the November 20, 2006 work session the council removed site #26 from consideration to accom- <br />modate the development project. <br /> <br />nd <br />Community Forum #4 was held November 2, 2006 and asked for further input on a site for a new city <br />hall. The body of the meeting stimulated the Project Team to think about what distinguishes a City Hall <br />from other buildings and gives it lasting value, and how the two sites forwarded by City Council (Existing <br />City Hall and Butterfly Lot/Rock N Rodeo) compare in giving the greatest benefit for Eugene. The Rock <br />N’ Rodeo/Butterfly Lot site was favored over the Existing City Hall site by a vote of 36 to 17. The <br />Forum #4 presentation and report are also available at www.eugenecityhall.com. <br /> <br />At the December 11, 2006 work session five councilors initially supported the Rock N’ Rodeo/Butterfly <br />Lot site while three supported the Existing City Hall site in voting on an amendment to the motion for <br />City Hall site selection. However, two councilors elected to change their vote on the final motion so that <br />the final vote was 7-1 to select the Rock N’ Rodeo/Butterfly Lot site for use in ongoing planning and <br />design for City Hall. <br /> <br />