Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Annexes <br />Table A-6 Hazard Mitigation Action Items <br />New <br />Existing <br />Hazard <br />Mitigation Action <br />Estimated <br />Timeline <br />Assets <br />Assets <br />Mitigated <br />Cost <br />X <br />Multi -Hazard <br />Re -frame 4.3 miles of electric <br />$2.7M10 <br />2019-2020 <br />(windstorm, <br />line and undergrounding 1.5 <br />winter storms) <br />miles of line in 15 high outage <br />areas. <br />X <br />Multi -Hazard <br />Develop emergency water <br />$200K per <br />2018 - 2023 <br />(earthquake, <br />distribution sites using wells at <br />site <br />wildfire, <br />area schools/community <br />drought) <br />centers —two sites completed, <br />and three other sites are in <br />design or construction. <br />X <br />Multi -Hazard <br />Construct new water filtration <br />$50M <br />2023-2030 <br />(earthquake, <br />plant on the Willamette River <br />wildfire, <br />for secondary source of supply <br />drought) <br />and treatment/delivery options <br />for drinking water. <br />X <br />Multi -Hazard <br />Construct and test mobile <br />$80,000 <br />2020 <br />(earthquake, <br />treatment trailer that can deliver <br />wildfire, <br />potable water from sources like <br />drought) <br />rivers or pools. <br />Table A-6 below lists the action items contained in EWEB's hazard mitigation plan and <br />identifies the priority for each item based on probable benefits, funding availability and <br />project timeline. It is not intended to act as a formal cost/benefit analysis. <br />Table A-6 Mitigation Strategy Priority <br />Mitigation <br />Hazards <br />Costs <br />Benefits <br />Benefits <br />Grant <br />Can be <br />Priority <br />Action Item <br />Mitigated <br />Equal or <br />Eligible <br />funded <br />Exceed <br />? <br />under <br />Cost? <br />existing <br />programs <br />or <br />budgets? <br />Rebuild/Seismic <br />Earthquake, <br />Low <br />Moderate <br />Yes <br />Yes <br />Yes <br />High <br />Upgrades to <br />GMDs <br />Currin <br />Substation <br />m $1.5M of project funded via FEMA Public Assistance grant award (DR-4296) following 2016/17 <br />winter storms. <br />5-17 January 2020 <br />