Eugene -Springfield Area Natural Hazards Mitigation Plan <br />5. Annexes <br />■ Installed microgrid for back-up power to the emergency well and other facilities <br />at Howard Elementary School. Final commissioning will be completed this <br />summer. <br />■ Conducted power system and generator capability studies in 2018 for islanded <br />operation of critical loads at Leaburg facility. <br />■ Completed seismic anchoring retrofit of Spring Creek and Prairie Substation <br />transformers. <br />5-21 January 2020 <br />