My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5303
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 1:42:25 PM
Creation date
6/26/2020 1:35:11 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Annexes <br />providing water under emergency conditions using portable generators and manual <br />level controls. <br />B.5 Evaluation of Recommended Action Items <br />Table B-4 lists Rainbow Water District's natural hazard Mitigation Action Items. <br />RWD is the lead agency and funding source for these initiatives unless otherwise noted. <br />Table B-4 Hazard Mitigation Action Items <br />New <br />Existing <br />Hazards <br />Mitiga <br />e <br />Assets <br />Assets <br />Mitigated <br />Cost <br />Multi - <br />Hazard <br />Install transfer switch and used <br />X <br />X <br />(earthquake, <br />backup generator at Rainbow <br />$12,000 <br />2016-17 <br />winter storm, <br />office (primary control center) <br />Completed <br />windstorm, <br />wildfire <br />Multi - <br />Hazard <br />Install transfer switch at Chase <br />X <br />X <br />(earthquake, <br />Wellfield for emergency water <br />$55,000 <br />2017-18 <br />winter storm, <br />supply and treatment power <br />Completed <br />windstorm, <br />wildfire <br />Multi - <br />Hazard <br />purchase generator and install <br />X <br />X <br />(earthquake, <br />transfer switch at Chase Wellfield <br />$8,000 <br />2017-18 <br />winter storm, <br />for backup EOC SCADA/lighting <br />Completed <br />windstorm, <br />wildfire <br />Earthquake <br />Flexible joints and seismically- <br />X <br />X <br />actuated isolation valves at Moe <br />$535,000 <br />2017-21 <br />Hill (Vitus Butte) Reservoir <br />Earthquake, <br />Install automatic valve actuators <br />X <br />X <br />Flood- <br />for chlorine gas cylinders at all <br />$50,000 <br />2018-20 <br />Riverine <br />wellfields (Chase equipped 2018) <br />Multi- <br />Install ham radio and emergency <br />Hazard <br />data transmission antennas at <br />X <br />(earthquake, <br />Kelly Butte and/or Moe Hill <br />$30,000 <br />2019-21 <br />winter storm, <br />Reservoirs. <br />wildfire <br />5-28 January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.