My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5303
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 1:42:25 PM
Creation date
6/26/2020 1:35:11 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Springfield Utility Board <br />NHMP Project Team Member: <br />Tracy Richardson, Utility Planner <br />CA Jurisdictional Profile <br />C.1.1 Introduction <br />Springfield Utility Board was founded in 1949 and is an independently operated <br />municipal electric and water utility governed by a locally -elected board. The utility <br />offers its customers some of the lowest water and electric rates in the Pacific <br />Northwest, with equity in excess of $100 million and with no debt. <br />• Population served: Approximately 32,000 <br />• Land area served: 25 square miles <br />This annex notes the SUB specific variances from the Eugene -Springfield Area NHMP <br />base plan (Sections 1-4). Variances arise due to differing risks faced by SUB compared <br />to the Cities of Eugene and Springfield. This is due to utility specific regulations, <br />infrastructure, and locations. Unless explicitly expressed by this annex, SUB complies <br />with the base plan. <br />C.1.2 Electric System <br />The Electric System supplies service to approximately 31,151 residential, commercial, <br />and industrial customers within the City of Springfield. <br />Power delivered to customers is supplied by Bonneville Power Administration (BPA). <br />The electric utility's annual operating budget is approximately $60M, with $6.2M <br />budgeted for capital work. <br />• Total Electric System Service Area: 25+ miles <br />• Miles of Overhead Transmission Line: 24 <br />• Miles of Overhead Distribution Line: 192 <br />• Miles of Underground Distribution Line: 140 <br />• Substations:8 <br />5-33 January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.