My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5303
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 1:42:25 PM
Creation date
6/26/2020 1:35:11 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />i <br />Y <br />C <br />Ref. # <br />c <br />s <br />o <br />.��. <br />Action Name <br />Problem Statement <br />Mitigation Action <br />` <br />i <br />w <br />w <br />Eugene <br />Emergency <br />35 <br />P <br />S <br />P <br />S <br />S <br />P <br />Mass <br />Eugene and Springfield do not have <br />Develop and exercise a City <br />Management, <br />$450,000 <br />2024 <br />Evacuation <br />all -hazard Mass Evacuation Plans. <br />evacuation plan <br />Springfield <br />Emergency <br />Mara ement <br />EWEB operates 33 substations that are <br />essential assets for power delivery to our <br />Rebuild Currin Substation to include <br />community; most were built before <br />seismic upgrades and the Institute of <br />Cuff in Substation <br />awareness of seismic risk to the <br />Electrical and Electronics Engineers <br />36 <br />P <br />P <br />Upgrades <br />will <br />Northwest electric grid. EWEBstandards <br />to reduce risk interference <br />EWEB <br />$750,000 <br />2020-2021 <br />systematically upgrade each substation to <br />With electrical equipmentt from <br />meet current seismic codes and increase <br />geomagnetic disturbances. <br />reliability of these assets to withstand a <br />range of natural disasters. <br />This critical facility was originally built <br />Seismically retrofit EWEB's Roosevelt <br />for electric and water operations, <br />Operations Center (ROC) to remain <br />Roosevelt <br />engineering and field crews, but is being <br />operational after an earthquake. After <br />Operations <br />updated to consolidate nearly the entire <br />completion move EWEB's dispatch <br />37 <br />P <br />Center (ROC) <br />utility workforce. Seismic upgrades as <br />into ROC from the EWEB <br />EWEB <br />$3.5 million <br />2018-2021 <br />Seismic <br />well as re -location and reinforcement of <br />Headquarters and build a new backup <br />Headquarters <br />Upgrades <br />primary and secondary communications <br />Dispatch Center in a seismically sound <br />are an essential component of the <br />building near Hayden Bridge. <br />consolidation efforts. <br />This project replaced an older substation <br />Replace older substation with new <br />and electrical equipment located right <br />Holden Creek Substation to include <br />along the river's edge to a more secure <br />seismic upgrades and the Institute of <br />location with equipment built to current <br />Electrical and Electronics Engineers <br />38 <br />P <br />S <br />P <br />S <br />S <br />New Holden <br />seismic standards. The next phase will <br />standards to reduce risk of interference <br />EWEB <br />$7 million <br />2018-2019 <br />Creek Substation <br />add a second transformer to create more <br />with electrical equipment from <br />redundancy for upriver customers, while <br />geomagnetic disturbance. This project <br />re -wiring significantly reduces exposure <br />will replace the Leaburg Substation on <br />to electric outages caused by tree limbs <br />the riverbank and move 17 miles of <br />on wires. <br />overhead electrical lines. <br />6-11 January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.