Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />i <br />Y <br />C <br />Ref. # <br />c <br />s <br />o <br />.��. <br />Action Name <br />Problem Statement <br />Mitigation Action <br />` <br />iOL <br />w <br />w <br />In the event of a regional power outage, <br />or broken distribution piping, emergency <br />Emergency <br />water sites distributed throughout <br />Develop three small emergency water <br />Rainbow <br />$25,000 per <br />56 <br />S <br />P <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />Water <br />neighborhoods would allow portable <br />distribution sites located at or near <br />Water District <br />sites <br />2019-2023 <br />Distribution Site <br />generators and small wells to provide 2-3 <br />private wells with tested water. <br />gallons of water per day to area residents <br />for health and safety. <br />For areas prone to landslides, using this <br />Two times the <br />All -Restraint <br />technology when main replacements <br />Use all -restraint water mains for <br />Rainbow <br />cost of <br />57 <br />S <br />P <br />Water Mains - <br />occur will reduce the likelihood of water <br />landslide risk transmission mains. <br />Water District <br />standard <br />2019-2029 <br />RWD <br />main breaks causing outages and <br />potential boil -water notices. <br />piping. <br />58 <br />P <br />S <br />S <br />S <br />S <br />Glenwood Sub <br />Springfield <br />$5 million <br />2015-2022 <br />Station <br />Utili Board <br />59 <br />P <br />S <br />S <br />S <br />S <br />Thurston Water <br />Springfield <br />TBD <br />2020-2028 <br />Treatment Plan <br />Utili Board <br />60 <br />P <br />Seismic <br />Seismically retrofit critical electric <br />Springfield <br />$7 million <br />2018-2019 <br />Upgrades <br />facilities. <br />Utility Board <br />57th Street <br />Seismically retrofit the South 57th <br />Springfield <br />61 <br />P <br />Reservoir <br />Street Reservoirs. <br />Utility Board <br />$2.4 million <br />2019-2023 <br />Retrofit <br />62 <br />P <br />Moe Reservoir <br />Seismically retrofit the Moe Reservoir. <br />Springfield <br />$279,900 <br />2020-2024 <br />Retrofit <br />Utility Board <br />63 <br />P <br />Seismically <br />Replace 4000 feet of water distribution <br />Springfield <br />$910,000 <br />2019-2028 <br />Stable Pipes <br />system pipeline. <br />Utility Board <br />Substation <br />Springfield <br />64 <br />P <br />S <br />S <br />S <br />Protection <br />Utility Board <br />$1.14 million <br />2019-2028 <br />Upgrades <br />Electric <br />Springfield <br />65 <br />P <br />S <br />S <br />S <br />S <br />Distribution <br />Utility Board <br />$242,000 <br />2019 <br />System Upgrades <br />6-15 January 2020 <br />