My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5303
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 1:42:25 PM
Creation date
6/26/2020 1:35:11 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />Mitigation Action Item Progress Report Form (From 2014) <br />From Date: 02-2015 <br />To Date: 02-2020 <br />#1: Dam Safety Evacuation <br />City of Eugene: Public Works City of Springfield: Development and <br />Public Works <br />Kevin Holman (Eugene) and Ken Vogeney (Springfield) <br />❑ Project Completed ® Project Restructured <br />❑ Project Canceled ❑ Project delayed: <br />❑ Project On Schedule Anticipated Completion date: <br />Summary of Project Progress <br />What was accomplished for this project during this reporting period (2015 <br />2020)? <br />For the 2020 NHMP update dams and hazardous material incidents were moved <br />to annexes within the plan since they are not natural hazards, per say. Within <br />each identified natural hazard section dam failure and hazardous material <br />incidents are now two of four "impacts" the plan considers for each hazard. <br />2. What obstacles, problems, or delays did the project encounter? <br />No obstacles or problems experienced. These mitigation action items are going <br />to be reorganized and placed within the appropriate hazard to better align with <br />the objectives of Natural Hazard Mitigation Plans. <br />3. If uncompleted, is the project still relevant? Should the project be changed or <br />revised? <br />These projects are going to be revised to fit within the new identified natural <br />hazard categories as outlined in the 2020 NHMP. <br />4. Other comments; <br />N/A <br />6-66 January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.