Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />Mitigation Action Item Progress Report Form (From 2014) <br />From Date: 02-2015 <br />To Date: 02-2020 <br />#7: Seismic Evaluation of Non -Critical Facilities (FEMA 154) <br />City of Eugene Public Works <br />Eric Johnson <br />® Project Completed ❑ Project Restructured <br />❑ Project Canceled ❑ Project delayed: <br />❑ Project On Schedule Anticipated Completion date: <br />Summary of Project Progress <br />1. What was accomplished for this project during this reporting period (2015 <br />2020)? <br />A Damage Assessment Group was formed. This group has developed an <br />Emergency Operations Plan Annex for damage assessment and conducted <br />Safety Assessment Program and Bridge Assessor training. The foundations of <br />the group is in place, and will continue to be reviewed, evaluated, and changed <br />as necessary <br />2. What obstacles, problems, or delays did the project encounter? <br />N/A <br />3. If uncompleted, is the project still relevant? Should the project be changed or <br />revised? <br />This project is considered complete. Projects moving forward will address <br />specific mitigation projects developed by the Damage Assessment Group. <br />4. Other comments; <br />N/A <br />6-72 January 2020 <br />