Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />Mitigation Action Item Progress Report Form (From 2014) <br />From Date: 02-2015 <br />1 To Date: 02-2020 <br />#15: Maintain Frequent Stormwater Flooding Location Inventory <br />City of Eugene Public Works <br />Rob Hallett <br />® Project Completed ❑ Project Restructured <br />❑ Project Canceled ❑ Project delayed: <br />❑ Project On Schedule Anticipated Completion date: <br />Summary of Project Progress <br />1. What was accomplished for this project during this reporting period (2015 <br />2020)? <br />Public Works Maintenance Division maintains an Urban Stromwater Flooding <br />Quick Check List for inspection and maintenance of the stormwater conveyance <br />systems. Included in this list are priority inlets, outfalls, catch basins, and curb <br />inlets. Staff use this list prior to, during, and after rain and snow events. The list <br />is updated on a yearly basis and is included in the department's emergency on - <br />call book. <br />2. What obstacles, problems, or delays did the project encounter? <br />N/A <br />3. If uncompleted, is the project still relevant? Should the project be changed or <br />revised? <br />This project is considered complete. Projects moving forward will address <br />specific mitigation projects the Urban Stormwater Flooding Quick Check List <br />may identify. <br />4. Other comments; <br />N/A <br />6-80 January 2020 <br />