Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />1. Mitigation Planning <br />Table 1-3 Mitigation Action Items Summary <br />rivinigalloff Action <br />4 Update the Wildland-Urban Update the Eugene -Springfield WUI plan and address access routes. <br />Interface (WUI) Plan <br />5 <br />Species Specific Tree Removal <br />Identify and remove species with known failure profiles and potential defects. Plant or <br />replant drought tolerant and disease, pest and damage resistant tree species. Work with <br />City departments, contractors and non -profits to complete this work. <br />E <br />26 <br />Defective Tree Maintenance <br />Utilize contract crews to perform maintenance pruning. Provide clearance <br />0 <br />and mitigate defects, such as overextended branches prone to failure under <br />y <br />increased loads, along major arterials and priority traffic routes. Unhealthy <br />or structurally unsound trees will be removed and replanted. <br />`w £ <br />27 <br />Sheltering <br />Develop a consolidated plan for community sheltering and associated outreach needs to <br />p <br />provide sheltering, during large scale events or incidents when American Red Cross <br />N <br />resources are diverted elsewhere. <br />O <br />c <br />28 <br />Lahar Risk Study <br />Evaluate the lahar risk to the McKenzie River valley. <br />v <br />29 <br />Ash Removal <br />Research ash removal methods. <br />O <br />0 <br />Food Supplier Coalition <br />Develop a coalition of food suppliers to identify options to address supply chain <br />concerns after a major disaster. <br />1 <br />Vulnerable Populations Two <br />Utilizing relevant vulnerable populations maps developed for the Lane Livability <br />Weeks Ready <br />Consortium, develop an outreach plan to engage vulnerable populations to be Two <br />Weeks Ready with emergency supplies. <br />2 <br />Long-term Care and <br />Support and assist Lane County Public Health in developing and conducting trainings <br />Nursing Home Facilities <br />or outreach on emergency preparedness and planning for long-term and nursing home <br />= <br />Emergency Planning <br />facility leadership as they take steps to comply with the Emergency Preparedness Rule <br />Assistance <br />set forth by the Centers for Medicare and Medicaid Services. <br />3 <br />Public Safety <br />Work with the Lane Radio Interoperability Group (LRIG) System partners to develop a <br />Communications Reliability <br />first responder communication system with public safety grade reliability. <br />4 <br />Damage Assessment Plan <br />Finalize the Eugene -Springfield Damage Assessment Plan <br />5 <br />Mass Evacuation <br />Develop and exercise a City evacuation plan <br />1-12 January 2020 <br />