Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />from Howard can be used for smaller scale projects at other emergency well <br />sites. <br />3. If uncompleted, is the project still relevant? Should the project be changed or <br />revised? <br />These projects are still relevant but require on -going resources, both <br />engineering, design and capital improvements such as new switch gear to direct <br />power just to critical loads to fully implement. As originally scoped, this <br />mitigation item focused on developing a plan with implementation in 2020 so in <br />this regard we are ahead of schedule. <br />4. Other comments: <br />Back-up generation and adequate fuel storage is another important solution to <br />maintain operability of critical facilities. hi 2018, EWEB placed two new back- <br />up generators at its Hayden Bridge filtration plant which are sufficient to deliver <br />about 20 mgd of water to the community. <br />We plan to have another emergency water station installed at the Sheldon Fire <br />Station in 2019 and are sharing costs for an upsized fuel storage tank at the fire <br />station to ensure we can run the emergency well in addition to the fire station <br />loads, during emergency conditions. <br />6-90 January 2020 <br />