Laserfiche WebLink
The periodic application of the cost index described in 2.4.1, or <br />A change in the costs of materials, labor or real property applied to projects or project <br />capacity on a project list adopted pursuant to ORS 223.309. <br />Such an amendment does not constitute a "modification" under Section 2.3, above. <br />2.4.1 Adopted / Incorporated Cost Index <br />When preparing periodic cost index adjustments, the City uses Tthe 20-city national <br />average construction cost index, as published by Engineering News -Record (ENR). , shall be <br />For purposes of determining the <br />adjustment for acquisition costs of real property, the City uses the Lane County <br />Assessor's Office Certified Ratio Study. <br />2.5 Expending City of Eugene SDCs <br />Improvement fee revenue may be spent only on capacity increasing capital improvements included on <br />the adopted capital improvement lists, as defined in Eugene Code 1971 section 7.715(2), or debt <br />related to such improvements. Reimbursement fee revenue may be spent only on capital <br />improvements associated with the systems for which the fees are assessed and debt related to such <br />improvements. Revenue from both types of fees may be expended on direct costs of complying with <br />related state statutes. <br />3.0 Transportation System <br />The Transportation Systems Development Charge (SDC) is made up of several components. The <br />costs of these components include the total cost of design, construction, right-of-way acquisition, <br />purchasing, testing, and project administration. The components included in this analysis are: <br />Collector and arterial streets <br />➢ Non -assessable linear section construction costs, including, but not limited to, on - <br />street bike lanes and greenways <br />➢ Intersection construction costs <br />➢ Traffic signal costs <br />➢ Street light costs <br />➢ Bridge and other structure construction costs <br />Off-street bicycle and multi -use paths <br />➢ Path construction costs <br />➢ Path light costs <br />The cost impacts of new development on these components are allocated on the basis of p.m. peak <br />City of Eugene SDC Methodologies - General Methodology <br />Page 11 <br />