My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5306
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:19:47 PM
Creation date
7/23/2020 3:17:32 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
7/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE G-1 <br />Potential Impact Reductions, Credits, and Compact Development Adjustments <br />for System Development Charges <br />NOTE: These are examples only; eligibility is established at time of review of plans which approve the proposed improvements. <br />IMPACT REDUCTIONS: <br />• Successful bus pass program for employees <br />CREDITS: <br />• Street width in excess of assessable width <br />• Off -site, non-contiguous arterial or collector intersection <br />• Street light on arterial or collector street <br />• Off -site arterial or collector right-of-way and easement acquisition <br />• Traffic signal on arterial or collector street <br />• Off-street shared -use paths identified in adopted City plan <br />• Off -site eligible public improvements where equivalent assessments can be collected <br />COMPACT DEVELOPMENT ADJUSTMENTS: <br />• Adjustments based on site's location in relation to nodal areas, key corridors, frequent transit <br />network routes, and Downtown Plan and West University Commercial Districts boundaries <br />• Transportation Demand Management (TDM) agreement to reduce parking spaces <br />• Accessory dwelling units (ADUs) <br />11 2. Wastewater System <br />CREDITS: <br />• Public Wastewater collection lines > 8-inch diameter <br />• Public pump stations and pressure lines that serve more than the development <br />• Off -site public improvements, where equivalent assessments can be collected <br />• Prior payment of Metropolitan Wastewater Service District debt service <br />11 3. Stormwater System <br />IMPACT REDUCTIONS: <br />• Destination and Quantity: Reduction or elimination by retention of stormwater otherwise <br />discharged into public system <br />• Pollution: Reduction of pollution via approved treatment techniques <br />CREDITS: <br />• Stormwater collection lines > 24inch diameter <br />• Major drainage channels: construction and off -site easement <br />• Off -site public improvements where equivalent assessments can be collected or that <br />benefit existing developments <br />City of Eugene SDC Methodologies - General Methodology <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.