My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 2: Study Area and Land Use 5 <br />• Laurel Hill <br />• South Amazon <br />• Royal Node <br />MAJOR SYSTEM BASINS AND SUB-BASINS <br />To analyze flow in the wastewater collection system, the study area was divided into major system basins <br />and sub-basins as shown in Map 2-A. These basins and sub-basins were initially based on the network <br />system developed in the 1978 Sewer System Evaluation Survey (SSES) report by CH2M-Hill and the 1992 <br />USSMP. Minor basin boundary modifications have been made to those basins as published to reflect <br />actual construction, elimination of the urban reserve and increased topographic mapping capabilities. In <br />addition, the Bethel South major basin was renamed South West, and the Bethel North basin was <br />renamed Bethel. <br />DEVELOPMENT PLANNING <br />Development within Eugene and Springfield is guided by the Eugene-Springfield Metropolitan Area <br />General Plan (Metro Plan). The Metro Plan, which serves as the regional comprehensive land use plan, <br />promotes compact growth through the use of an urban growth boundary. Growth occurs by <br />development of vacant and underutilized lands, as well as redevelopment inside the urban growth <br />boundary. Development within Eugene is also guided by the Envision Eugene Comprehensive Plan, <br />adopted in 2017 as Eugene’s city-specific land-use plan. The Envision Eugene Comprehensive Plan guides <br />future growth within Eugene’s UGB. <br />More detailed land-use planning is provided in neighborhood refinement plans, special area studies, and <br />the Eugene-Springfield Public Facilities and Services Plan. This level of detailed planning allows public <br />utilities, services, and facilities to be designed and constructed in an orderly and efficient manner. <br />PRESENT AND FUTURE LAND USES <br />The Envision Eugene Comprehensive Plan used a geographic model, along with input from technical <br />experts, to create the inventory of the City’s land supply. The City compared projected land-use needs to <br />the capacity available in the City’s buildable land supply as further described in the Envision Eugene <br />Employment Land Supply Study. Based on this analysis, the UGB was expanded in 2017 to meet 2012- <br />2032 land-use needs. Table 2-1 uses similar methods as the Envision Eugene Comprehensive Plan to <br />illustrate how development is expected to affect each wastewater basin. <br />For residential development, the City receives a certified city-wide population estimate. The City <br />estimated 2017 basin populations using methods similar to the Comprehensive Plan’s method (2.24 <br />persons per household per the 2010 U.S. Census multiplied by the number of residential address points <br />in the Regional Land and Information Database). These results are shown in Table 2-1. <br />The 2032 basin population estimates in Table 2-1 equal the 2017 population plus anticipated growth <br />through 2032. Housing growth was estimated using several methods. On vacant and partially vacant <br />areas the method was similar to the Envision Eugene Comprehensive Plan, Residential Land Supply Study <br />housing capacity estimates for 2012-2032. Also taken into account was a baseline amount of housing <br />redevelopment. Finally, consideration was given to political measures that increase legal residential land <br />density. Every new housing unit was assumed to add 2.24 persons to the basin.
The URL can be used to link to this page
Your browser does not support the video tag.