My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 3: Existing Wastewater Systems 12 <br />Table 3-1: Wastewater Inventory by Year Constructed – Gravity System <br />Year Constructed Percent of System Length of Pipe (feet) <br />1912-1919 1% 437,680 <br />1920-1929 2% 90,960 <br />1930-1939 1% 23,800 <br />1940-1949 4% 141,330 <br />1950-1959 9% 336,790 <br />1960-1969 25% 925,180 <br />1970-1979 17% 617,240 <br />1980-1989 9% 337,190 <br />1990-1999 23% 850,290 <br />2000-2009 7% 273,090 <br />2010-2019 2% 77,400 <br />Total 3,716,940 <br /> <br />Table 3-2: Wastewater Inventory by Year Constructed – Pressure System <br />Year Constructed Percent of System Length of Pipe (feet) <br />1950-1959 0.4% 266 <br />1960-1969 19% 11,120 <br />1970-1979 2% 1,126 <br />1980-1989 35% 21,257 <br />1990-1999 34% 20,444 <br />2000-2009 9% 5,293 <br />2010-2019 0% 22 <br />Total 59,665 <br />The estimated replacement value of the gravity collection system, including 25% for engineering, based <br />on 2019 construction costs, is $855 million, as shown in Table 3-3.
The URL can be used to link to this page
Your browser does not support the video tag.