My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 4: Design Criteria 34 <br />Example Calculation <br />The following is an example calculated using wastewater flow rates in Table 4-3: <br />Preliminary development plan for a site containing 100 gross acres: <br />• 10 acres Neighborhood Commercial <br />• 10 acres Light-Medium Industrial <br />• 60 acres Low-Density Residential <br />• 20 acres Medium-Density Residential <br />Land Use Site Area <br />(Gross Acres) <br />Base Flow Rate <br />(Gal/Acre/Day) <br />Average Dry Weather Flow <br />(1,000 Gal/Day) <br />Low-Density Residential 60 600 36.0 <br />Medium-Density Residential 20 1,605 32.1 <br />Neighborhood Commercial 10 1,360 13.6 <br />Light/Medium Industrial 10 3,040 30.4 <br />Total Average Base Flow (Kgal/day) = 112.1 <br />Peak Base Flow (Kgal/day)1 = 354.7 <br />Infiltration (Kgal/day)2 = 200.0 <br />Peak Design Flow (Kgal/day) = 554.7 <br />Peak Design Flow (CFS) = 0.860 <br />1 Peak Flow Factor = 25 - 20.2 (112.1)0.0165 <br />2 Infiltration = 100 gross acres at the rate of 2,000 GAD <br />
The URL can be used to link to this page
Your browser does not support the video tag.