My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVENTORY OF EXISTING CONDITIONS <br />FAA Airport Improvement Program Grant Receipts <br />The Airport has historically received entitlement, and at times discretionary grant money from FAA. <br />Table 1-20 lists the total AIP grant receipts since 2009. As shown in the table, some projects can be <br />funded in multiple consecutive years, such as the 2014/2015 terminal building project. Other projects may <br />require one large investment. Often these require discretionary funding from FAA. In those instances, <br />funding levels are typically reduced the following year so that FAA can balance funding allocation to all <br />airports in the region. <br /> <br />TABLE 1-20 <br />AIP GRANT HISTORY <br />YearTotal AIPDescription of Work <br />Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate <br />2009$5,835,922 <br />Apron, Rehabilitate Taxiway <br />2010$9,026,253Rehabilitate Runway - 16R/34L <br />Acquire Snow Removal Equipment, Construct Deicing Containment <br />2011$2,397,048 <br />Facility, Rehabilitate Apron, Rehabilitate Taxiway <br />2012$947,153Rehabilitate Apron <br />Acquire Friction Measuring Equipment, Security Enhancements <br />2013$459,375 <br />\[Phase 1 - Design\], Wildlife Hazard Assessments <br />2014$7,926,480Expand Terminal Building <br />2015$3,047,216Expand Terminal Building, Update Airport Master Plan Study <br /> Source: Federal Aviation Administration, 2016 <br />EUGENE AIRPORT MASTER PLAN 1-76 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.