|
AVIATION DEMAND FORECASTS
<br />TABLE 2-27
<br />BASED AIRCRAFT FORECAST
<br />Planning Years
<br />Description2015
<br />202020252035
<br />Based Aircraft188193200216
<br />CAGR0.5%0.6%0.7%
<br />Sources: FAA 2015 TAF Report, RS&H Analysis, 2016
<br />
<br />
<br />TABLE 2-28
<br />OVERALL SUMMARIZATION OF AIRPORT PLANNING FORECASTS
<br />Average Annual Compound Growth Rates
<br />Base Yr. Base Base Base Base Base Yr. to Base Yr. to Base Yr. to Base Yr. to
<br />LevelYr.+1yr.Yr.+5yrs.Yr.+10yrs.Yr.+20yrs.+1+5+10+20
<br />2015202020252035
<br />20152016202020252035
<br />Passenger Enplanements
<br /> Air Carrier81,339132,402143,322155,412181,10062.78%12.00%6.69%4.08%
<br /> Commuter362,760356,322385,154417,313485,189-1.77%1.21%1.41%1.46%
<br /> TOTAL 444,099488,724528,476572,725666,28910.05%3.54%2.58%2.05%
<br />Operations
<br /> Itinerant
<br /> Air carrier8,34810,19113,14015,17317,64022.08%9.50%6.16%3.81%
<br /> Commuter/air taxi8,0996,0854,8704,4815,024-24.87%-9.67%-5.75%-2.36%
<br /> Total Commercial
<br />16,44716,27618,01019,65422,664-1.04%1.83%1.80%1.62%
<br />Operations
<br /> General aviation21,98821,73121,99122,32223,000-1.17%0.00%0.15%0.23%
<br /> Military1,7251,7251,7251,7251,7250.00%0.00%0.00%0.00%
<br /> Local
<br /> General aviation18,32917,74718,32219,06720,649-3.18%-0.01%0.40%0.60%
<br /> Military1,7251,7251,7251,7251,7250.00%0.00%0.00%0.00%
<br /> TOTAL OPERATIONS60,21459,20461,77364,49369,763-1.68%0.51%0.69%0.74%
<br />Peak Hour Operations 666680.00%0.00%0.00%1.45%
<br />Cargo/mail (enplaned +
<br />0.02%0.01%0.16%0.23%
<br />1,869,6471,870,0981,870,8461,899,1951,957,606
<br />deplaned tons)
<br />Based Aircraft
<br /> Single Engine (Nonjet)1521531551591690.66%0.39%0.45%0.53%
<br /> Multi Engine (Nonjet)15151515150.00%0.00%0.00%0.00%
<br /> Jet Engine17171922280.00%2.25%2.61%2.53%
<br /> Helicopter444440.00%0.00%0.00%0.00%
<br /> Other000000.00%0.00%0.00%0.00%
<br />0.53%0.53%0.62%0.70%
<br /> TOTAL188189193200216
<br />Sources: FAA 2015 TAF Report, FAA Preliminary 2016 TAF data, RS&H Analysis, 2016
<br />
<br />EUGENE AIRPORT MASTER PLAN 2-38
<br />
<br />
|