Laserfiche WebLink
FACILITY REQUIREMENTS <br />TABLE 3-1 <br />AIRCRAFT FLEET MIX <br />Percentage of Total <br />Aircraft <br />Fleet Mix <br />Commercial Service Aircraft26% <br />Single Engine44% <br />Twin Engine9% <br />GA Jets 21% <br />Source: RS&H Data Collection and Analysis, 2016 <br /> <br />Hourly Throughput Capacity <br />Hourly throughput capacity is an important element in understanding how an airport can accommodate <br />aircraft with or without a certain amount of delay during daily operations. Meteorological conditions have <br />considerable influence on airfield capacity each day. Airfield capacity is at its highest during visual <br />meteorological conditions (VMC) when visibility is greater than 3 miles and cloud ceilings are above 1,000 <br />feet. In these conditions, aircraft are able to fly closer to one another allowing more aircraft to land within <br />a single hour. When weather is below specific visibility and cloud clearance minimums, aircraft must fly <br />farther apart and have more restricted flight operations to ensure safety. When aircraft are further apart, <br />fewer landings can occur within a single hour. <br /> <br />Eugene Airport has two parallel runways, with Runway 16R-34L acting as the primary runway. <br />Understanding available FAA flight procedures and knowing how ATC operates the airfield is another <br />important factor for determining the airfield capacity. For the purpose of this analysis, it was assumed that <br />aircraft at or exceeding 12,500 pounds were prioritized to land and depart from the main runway (Runway <br />16R) and aircraft less than 12,500 pounds were given the ability to land and depart from either runway <br />(16R or 16L) so long as it did not impede large aircraft operations on the main runway. This matches the <br />typical operational procedures of ATC at Eugene Airport. <br /> <br />Figure 3-2, Table 3-2, and Table 3-3 show the hourly throughput capacity during both visual and <br />instrument meteorological conditions for Eugene Airport. Hourly throughput capacity during VMC is <br />optimized for arrival and departure operations through the use of both runways, achieving 68 arrivals and <br />68 departures per hour, totaling 136 operations per hour. Operational throughput is reduced during IMC <br />conditions to 48 arrivals and 48 departures per hour, totaling 96 operations per hour. As the proportion of <br />arrival and departure percentages fluctuates, arrival/departure trade-offs are made for the capacity of <br />each type of operation, as shown in the following figure and tables. Discussions with Air Traffic Control <br />indicated that peak hour operations only average approximately 10 arriving or departing aircraft, <br />supporting the conclusion of this analysis that, under present circumstances, hourly capacity is not an <br />issue. <br /> <br />EUGENE AIRPORT MASTER PLAN 3-5 <br /> <br />