Laserfiche WebLink
AIRPORT DEVELOPMENT ALTERNATIVES <br />Terminal Family 2 Option 1 <br />Reorient north via Concourse A expansion <br />Benefits: <br />» Reorients terminal to airfield <br />maximizing land use efficiency. <br />» Allows dual-sided concourse with <br />minimal or no impact to existing GA <br />facilities. <br />Challenges: <br />» Potential impacts to gate availability <br />and operations during construction. <br /> <br />Source: RS&H Analysis, 2017 <br />Terminal Family 2 Option 2 <br />Reorient north via new concourse <br />Benefits: <br />» Reorients terminal to airfield <br />maximizing land use efficiency. <br />» Enables reuse of land currently <br />holding dilapidated buildings. <br />Challenges: <br />» Requires demolition of buildings with <br />known environmental hazards and <br />intrudes upon GA hangars <br /> <br />Source: RS&H Analysis, 2017 <br />Terminal Family 2 Option 3 <br />Reorient north via new concourse modified <br />Benefits: <br />» Reorients terminal to airfield <br />maximizing land use efficiency. <br />» Enables reuse of land currently holding <br />dilapidated buildings. <br />Challenges: <br />» Requires demolition of buildings with <br />known environmental mitigation <br />requirements and intrudes upon <br /> <br />existing GA hangar development. <br />Source: RS&H Analysis, 2017 <br />EUGENE AIRPORT MASTER PLAN 4-23 <br /> <br />