Laserfiche WebLink
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Taxiway A1-A5: Phase II - Construction <br />Project Description: <br />Construct new Taxiway Connector 1 and reconstruct Taxiways A1 and A2 to meet FAA design guidance for ADG III/ TDG 5 <br />aircraft. Reconstruct Taxiway A from the point immediately south of Taxiway C and include installation of SMGCS lighting <br />preparation components. Remove existing Taxiway A3. <br />Project Trigger: <br />Needed as soon as practical to improve safety by meeting FAA Advisory Circular 150/5300-13A design standards. <br />Project Justification: <br />Taxiways which do not meet FAA design standards present risks to the safe and efficient movement of aircraft on the ground. <br />Additionally, preparing for the installation of a Surface Movement Guidance and Control System (SMGCS) route from the <br />terminal to the main runway ends improves safe pilot ground movements by providing situational awareness during low visibility <br />conditions and inclement weather. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2018 - Q12018 - Q22019 - Q12019 - Q3 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$161,400$807,000$8,070,000$645,600 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$9,684,000$10,169,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-40 <br /> <br />