My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIRPORT LAYOUT PLAN <br />One of those expansions is a ticketing and baggage expansion on the north side of the building. The <br />other expansion, also on the north side, is a concourse expansion. The concourse expansion is supported <br />with additional apron along with a taxilane (Taxilane K). This concourse expansion is shown as Concourse <br />C on the sheet. The concourse and apron expansion require existing hangars to be removed and located <br />to another location. <br /> <br />Airside improvements shown on the sheet include three aircraft hard stands and a centralized deicing <br />facility with the ability to accommodate three ADG III aircraft are proposed adjacent to the existing <br />location of Taxiway D and K. The location of the deicing facility requires the existing centerfield windcone <br />to be relocated to a new location. It is recommended that traffic indicators be installed when the <br />centerfield windcone is relocated. Finally, a future partial parallel taxiway (Taxiway G) is planned for <br />adjacent to Taxiway A along with an additional Remain-Overnight Parking (RON) position on the <br />proposed apron, south of Taxiway F. <br /> <br /> <br />In regard to landside improvements, the loop road along with the adjacent parking is modified. The <br />airport entrance is reconfigured with a roundabout, and the rental car facility is expanded to the south. <br />Short-term and long-term parking expand within the boundaries of the proposed loop road. A cell phone <br />lot is proposed off of Northrup Drive and the existing employee parking lot will be relocated and <br />expanded to the west. Before the expansion of the employee parking can occur, the existing fuel facility <br />must be relocated to the future location off of Boeing Drive. The future development also programs space <br />for commercial vehicle staging. <br />6.4.7 South General Aviation Terminal Area Plan (Sheet 7) <br />The South General Aviation Area Plan depicts existing and future general aviation facilities on the <br />southern portion of the Airpor, as well as taxiway infrastructure improvement. Upgrades <br />to the segment of the future taxiway between existing Taxiway G and Taxiway H are shown designed to <br />accommodate ADG III aircraft. A future aircraft run up area is shown between Taxiway H and Taxiway A9, <br />adjacent to Taxiway A. The run up is designed to accommodate small piston aircraft, while providing <br />proper ADG III separation for aircraft taxiing on Taxiway A. The placement of the run up area requires the <br />perimeter roadway to be realigned. <br /> <br />The sheet also depicts the preferred location of the future fuel facility. Adjacent to the future fuel facility is <br />a future landside maintenance facility, which is planned to be used primarily for equipment and material <br />storage. The site will include vehicle parking along with an above ground fuel tank, which will serve airport <br />maintenance equipment. <br />6.4.8 North General Aviation Terminal Area Plan (Sheet 8) <br />The North General Aviation Area Plan depicts existing and future general aviation facilities on the <br />northern portion of the Airport, as well as dimensional criteria involving runway and taxiway surfaces. The <br />sheet depicts the future build out of the East General Aviation Ramp (EGAR). Buildings 47, 52, 55 and 57 <br />are displaced because of the apron and concourse expansion. These buildings are relocated and shown as <br />buildings 92, 93, 94 and 95 in the future condition. <br /> <br /> EUGENE AIRPORT MASTER PLAN 6-5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.