Laserfiche WebLink
<br />1 SUMMARY OF POTENTIAL UTILITY CONSERVATION OPPORTUNITIES <br />(UCO) <br /> <br />As part of the ASHRAE Level 1 Energy Audit walk through, the following Utility Conservation <br />Opportunities were identified. <br />» Replace T12 lamps with T8 lamps <br />» Provide programmable thermostat controller and BMS system <br />» Replace the three air cooled split system units, DX-1 to 3 with associated Force Air Furnace (FAF) and <br />one air cooled split system (server room), with heat recovery VRF system <br /> <br />2 UTILITY CONSERVATION OPPORTUNITIES (UCO) <br /> <br />2.1 SUMMARY AND RECOMMENDATIONS <br />A complete list of No Cost/Low Cost recommendations are listed in Appendix B. <br />2.2 LOW COST/NO COST UCO <br />Table 1 is included as a summary of the no cost, low cost, and capital improvement UCO for the Airport <br />Administration building: <br /> <br />TABLE 1: NO COST, LOW COST, AND CAPITAL IMPROVEMENT UCO <br />Complete <br />Suggested Measures Type <br />() <br />Adjust fan modes on thermostats to run in AUTO mode instead of ON <br /> <br /> <br />Many of the thermostats observed throughout the Administration building had <br /> In this position, the fans operate <br />continuously, whether or not cooling or heating is required. Not only does this <br />cause unnecessary electricity consumption, this also brings in unconditioned <br />outside air when the unit is not actively cooling or heating. This contributes to <br />decreased comfort levels in the building, and increased humidity in the building <br />No Cost <br />during the summer months. <br /> <br />be significantly reduced, and an improvement in building comfort conditions <br />can be expected as this will reduce the introduction of unconditioned air into <br />the building. <br /> <br /> <br /> ASHRAE LEVEL 1 ENERGY AUDIT ADMINISTRATION 1 <br /> <br />