My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Complete <br />Suggested Measures Type <br />() <br />Add Occupancy Sensors <br /> <br /> <br />For areas such as individual offices, break rooms, conference rooms and <br />restrooms, adding occupancy sensors to these rooms via dual technology is <br />Low Cost <br />recommended. Vacancy sensing (manual on automatic off) is recommended <br />for break rooms, offices and conference rooms. Some sensors and power <br />packs can be networked together to form a lighting control system. <br /> <br />Replace T8 lamp troffer fixtures with LED fixture cores <br /> <br /> <br />Replace existing T8 lamp troffer fixtures with LED fixture cores. It is anticipated <br />Low Cost <br />that this will save approximately 50% of the electrical consumption for <br />lighting. Additional advantage is dimming is standard on LED and could be <br />used to implement continuous daylight harvesting. <br />Replace Incandescent fixtures with LED fixtures <br /> <br /> <br />Low Cost <br />Replace existing incandescent fixtures with LED fixtures. It is anticipated that <br />this will save approximately 70% of the electrical consumption for lighting. <br /> <br />Inspection of the existing water meter <br /> <br /> <br />Based on utility bills, water cost $/KGAL seems high compared to other <br />buildings at the airport. Accuracy of the meter is an important component for <br />Low Cost <br />energy audit. It is recommended to check the accuracy of the meter and <br />actual billing paper work record. <br /> <br /> <br />Install Building Automation System <br /> <br /> <br />Installation of a Building Automation System can be as basic as a Networked <br />Communicating Thermostat system with a simple HVAC central controller, to <br />a complete DDC building automation system that integrates lighting controls, <br />Low Cost <br />occupancy sensors, and HVAC controls to optimize building systems <br />performance. Depending on the level of system desired, the capital <br />investment can be fairly large. The sophistication of the system depends on <br />systems. <br /> <br /> ASHRAE LEVEL 1 ENERGY AUDIT ADMINISTRATION 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.