My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Complete <br />Suggested Measures Type <br />() <br /> <br />Replace T8 lamp troffer fixtures with LED fixture cores <br /> <br />Replace existing T8 lamp troffer fixtures with LED fixture cores. It is <br />Low Cost <br />anticipated that this will save approximately 30% of the electrical <br />consumption for lighting of these fixtures. <br /> <br /> <br />Replace HPS fixtures with LED fixtures <br /> <br />Replace existing HPS lamp fixtures with LED fixtures. It is anticipated that this <br />Low Cost <br />will save approximately 30% of the electrical consumption for lighting of <br />these fixtures. <br /> <br /> <br />Install Building Automation System <br /> <br />Installation of a Building Automation System can be as basic as a Networked <br />Communicating Thermostat system with a simple HVAC central controller, to <br />a complete DDC building automation system that integrates lighting <br />Low Cost <br />controls, occupancy sensors, and HVAC controls to optimize building <br />systems performance. Depending on the level of system desired, the capital <br />investment can be fairly large. The sophistication of the system depends on <br />systems. <br /> <br /> <br />Inspection of existing gas and water meter system <br /> <br />Based on the utility bills, the $/therm of the gas supply seems high <br />compared to other buildings in the airport. Accuracy and proper function of <br />Low Cost <br />the gas meter is an important component of the energy audit. <br />In addition, the $/KGAL of the water supply and sewage seems high <br />compared to other buildings in the airport. Accuracy and proper function of <br />the water meter is an important component of the energy audit. <br /> <br /> <br />Install Lighting Control <br /> <br />A lighting control system could be implemented in phases with the <br />Capital <br />occupancy sensor and LED lighting retrofit to provide the following controls: <br />Improvement <br />» Dimming controls <br />» Time of day control <br /> <br /> ASHRAE LEVEL 1 ENERGY AUDIT AIR CARGO BUILDING 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.