My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX B: EUGENE AIRPORT UCO <br />RECOMMENDATIONS <br />Lighting UCOs <br />1. Replace HPS fixtures with LED in exterior of building. <br />2. Retrofit existing T8 fixtures with LED volumetric fixture inserts in: <br />a. Offices <br />b. Corridors <br />3. Provide lighting control system to control all lighting. <br />4. De-lamp fixtures in corridors and office spaces <br />5. Replace RF lights in storage areas with LED high bay fixtures. <br /> <br />HVAC UCOs <br />1. <br />2. Replace existing electronic digital thermostats with programmable thermostats. Recommend 7 <br />day programmable type. Recommend setback temperatures of 78 cooling, 65 heating. Occupancy <br />sensors interlocked with the thermostats could provide additional savings. <br />3. Install Building Automation System (BAS). The control system as originally designed is based on <br />Time-clock schedule controls. There are many levels of BAS systems which can more closely <br />monitor actual requirements of the HVAC systems and coordinate these requirements of all of the <br />systems to optimize operation and reduce energy consumption. <br />4. Test and Balance entire HVAC system. <br /> <br />Building Envelope UCOs <br />1. Replace damaged or missing door seals at gate doors. <br /> <br /> <br />Plumbing UCOs <br />1. Install low flow 0.5 GPM aerators on lavatory faucets. <br /> <br /> <br />Other UCOs <br />1. <br />2. Implement a recycling program at the airport. <br /> <br /> <br /> <br /> <br /> <br /> ASHRAE LEVEL 1 ENERGY AUDIT AIR CARGO BUILDING 16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.