My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.2 TERMINAL FLOOR AREA <br />3.2.1 Floor Area Detail <br />The terminal is a two story building. The first level of the main terminal houses a hold room (concourse B), <br />a security checkpoint, restaurant facilities, airline office spaces, TSA screening rooms, baggage claim and <br />make-up areas, and rental car offices. The second level of the main terminal houses TSA offices and <br />unused spaces for a future airport administration offices, a hold room (concourse A), and restaurant <br />facilities, all of which are connected to the terminal with a bridge walkway. The gross square footage of <br />the terminal is approximately 107,386 SF. <br />3.2.2 Floor Plan <br />An outline sketch of the first floor of the terminal building is included in Figure 2 and an outline sketch of <br />the second floor are included in Figure 3. <br /> <br />FIGURE 2: EUGENE AIRPORT TERMINAL FIRST FLOOR PLAN <br /> <br /> ASHRAE LEVEL 1 ENERGY AUDIT TERMINAL 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.