My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-24-F
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-24-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 1:22:48 PM
Creation date
1/25/2021 1:22:35 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to <br /> Administrative Order No. 58-20-24-F <br />Page 1 of 1 <br />SIDEWALK AND DRIVEWAY APRON REPLACEMENT <br />AND GRINDING MAINTENANCE SERVICES FEE SCHEDULE <br />(Effective January 1, 2021) <br /> <br />Service Fees <br />Through <br />June 30, <br />2021 <br />July 1, <br />June 30, <br />2022 <br />July 1, <br />June 30, <br />2023 <br />July 1, <br />June 30, <br />2024 <br />After June <br />30, 2024 <br />Sidewalk Replacement <br />One-time mobilization fee $600 <br /> <br />$600 $600 $600 $600 <br />Fee per sq. ft. <br />(minimum 25 sq. ft.) <br /> <br />For additional thickness in concrete <br />calculated using current concrete cost <br />multiplied by additional concrete <br />quantity. <br /> <br />$13 per sq. <br />ft.@ 4" <br />$13.26 per <br />sq. ft.@ 4" <br />$13.53 per <br />sq. ft.@ 4" <br />$13.80 per <br />sq. ft.@ 4" <br />$14.08 per <br />sq. ft.@ 4" <br />Driveway Apron Replacement <br />One-time mobilization fee <br /> <br />*One-time mobilization fee waived if <br />sidewalk replacement is being <br />performed in conjunction with <br />driveway apron replacement <br /> <br />$600* <br /> <br /> <br />$600* <br /> <br />$600* <br /> <br />$600* <br /> <br />$600* <br /> <br />Fee per sq. ft. <br />For additional thickness in concrete <br />calculated using current concrete cost <br />multiplied by additional concrete <br />quantity. <br /> <br />$16 per <br />sq.ft. @ 5" <br />$16.30 per <br />sq.ft. @ 5" <br />$16.63 per <br />sq.ft. @ 5" <br />$16.96 per <br />sq.ft. @ 5" <br />$17.30 per <br />sq.ft. @ 5" <br />Grinding <br />Fee per linear ft. <br />(minimum 5 linear ft.) <br /> <br />$31 per <br />lineal ft. <br />$31.62 per <br />lineal ft. <br />$32.25 per <br />lineal ft. <br />$32.89 per <br />lineal ft. <br />$33.55 per <br />lineal ft. <br />Fees may be reduced by up to $1000.00 for property with one single-family dwelling, where the property owner <br />applies for and meets City of Eugene Low-Income Subsidy qualification criteria, subject to funding. <br /> <br />2021- 2022- 2023- <br />beyond 4", additional fee will be <br />beyond 5" additional fee will be
The URL can be used to link to this page
Your browser does not support the video tag.