Laserfiche WebLink
Attachment 2 to Ex. <br />SIDEWALK RESPONSIBILITY BY JURISDICTION <br />2019 <br />CITY OF BEND- <br />3.30.030 Curb, Sidewalk and Driveway Approach Construction and Repair. <br />The City Council may order adjacent property owners to construct, alter, repair or remove curbs or <br />sidewalks or driveway approaches. The City will provide written notice to the adjacent property owner, <br />giving the property owner at least 30 days to complete the work. The time period may be shortened if <br />needed to remove a safety hazard. The notice shall state that the City will perform the required work if <br />not timely completed by the property owner and impose the cost of the City’s work, including <br />administrative costs, as a lien on the adjacent property. [Ord. NS-2182, 2012] <br />No in-house repair crew. Inspector inspects and prioritizes. Documents site and send letter for <br />response in 10 days. 2nd letter is sent out if no response. Spoke with Paul in April 2019. <br />CITY OF SALEM- <br />City of Salem responsibilities <br />The City of Salem has the following responsibilities: <br />Maintain sidewalks constructed prior to 1992, until such time that the sidewalk has been certified as <br />meeting acceptable standards of the City, at which time the responsibility transitions to the owner of <br />the adjacent property. <br />Repair sidewalks when a City-owned tree has caused damage to the sidewalk. <br />Maintain all corner curb ramps <br />Property owner responsibilities <br />Property owners have the following responsibilities: <br />Maintain sidewalks constructed after 1992, or sidewalks that have been certified as meeting <br />acceptable standards of the City. <br />Maintain all walkways and driveways between the curb line and the property line. <br />Report dangerous conditions in the sidewalk, including those caused by trees in public rights-of-way. <br />Keep sidewalks clear of construction materials, vehicles, debris, vegetation, snow, and ice at all times. <br />Salem has a budget for sidewalk repair (3 crews – 2 five person teams and a 2 person grinding and <br />patching team.) Areas for repair are identified and worked through on a priority basis. Wait times can <br />be extremely long. If a property owner does not want to wait they can have it repaired by contractor at <br />their expense. Spoke with Brandon Klouchs March 2019. <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />B