Laserfiche WebLink
Public Ways. <br />(b) Provision of pedestrian, bicycle and transit circulation among buildings <br />located within the development site, as well as to adjacent and nearby <br />residential areas, transit stops, neighborhood activity centers, office <br />parks, and industrial parks, provided the city makes findings to <br />demonstrate consistency with cons <br />means uses within 1/4 mile that can reasonably be expected to be used <br />by pedestrians, and uses within 2 miles that can reasonably be expected <br />to be used by bicyclists. <br />(5) The PUD complies with all of the following: <br />(a) EC 9.2000 through EC 9.4170 regarding applicable lot dimensions and <br />density requirements for the subject zone and any applicable overlay <br />zones. Within the /WR Water Resources Conservation Overlay Zone or <br />/WQ Water Quality Overlay Zone, no new lot may be created if more <br />than 33% of the lot, as created, would be occupied by either: <br /> 1. The combined area of the /WR conservation setback and any <br />portion of the Goal 5 Water Resource Site that extends landward <br />beyond the conservation setback; or <br /> 2. The /WQ Management Area. <br />(b) EC 9.6500 through 9.6505 Public Improvement Standards. <br />(c) EC 9.6706 Development in Flood Plains through EC 9.6709 Special <br />(d) EC 9.6710(6) Geological and Geotechnical Analysis. <br />(e) EC 9.6730 Pedestrian Circulation On-Site. <br />(f) EC 9.6735 Public Access Required. <br />(g) EC 9.6750 Special Setback Standards. <br />(h) EC 9.6775 Underground Utilities. <br />(i) EC 9.6780 Vision Clearance Area. <br />(j) EC 9.6791 through 9.6797 regarding stormwater flood control, quality, <br />flow control for headwaters area, oil control, source control, easements, <br />and operation and maintenance. <br />(k) All applicable development standards explicitly addressed in the <br />application. <br />An approved adjustment to a standard pursuant to the provisions beginning at <br />EC 9.8015 of this land use code constitutes compliance with the standard. <br />(6) The applicant has demonstrated that wastewater service, transportation <br />service, stormwater service, water service, and electrical service will be <br />provided to the site prior to the need for those facilities and services. Where <br />the facility or service is not already serving the site, this demonstration <br />requires evidence of at least one of the following: <br />(a) Prior written commitment of public funds by the appropriate public <br />agencies. <br />(b) Prior acceptance by the appropriate public agency of a written <br />commitment by the applicant or other party to provide private services <br />and facilities. <br />(c) A written commitment by the applicant or other party to provide for <br />offsetting all added public costs or early commitment of public funds <br />made necessary by development, submitted on a form acceptable to <br />the city manager. <br /> (7) PUDs proposed on development sites that are two acres or larger must <br />comply with either subparagraph (a) or (b), below: <br />Ordinance - Page 27 of 34 <br /> <br />