Laserfiche WebLink
6 developments were too small to qualify for MUPTE (fewer than 5 units) 20 <br />units (7%) <br /> <br />6 developments were outside the MUPTE boundary <br /> 55 units (18%) <br /> <br />3 developments were inside the boundary and were built without MUPTE 47 <br />units (16%) <br /> <br />Is the requirement to construct five units or more to qualify for MUPTE above and <br />beyond existing units that might be removed in the process, and does a <br />rehabilitation count as adding a unit? <br /> <br />Answer: The MUPTE statutes allow local jurisdictions to dictate the minimum number of <br />units in a MUPTE-eligible project. Eugene has determined that eligible developments <br />must consist of five or more units. However, the MUPTE Standards and Guidelines do <br />not require a net gain of five units. Therefore, it is possible, for example, to qualify by <br />removing one unit of housing and then replacing it with five. Staff is not able to identify <br />an instance where this has actually occurred in Eugene. A MUPTE is also possible if an <br />existing structure that is not in housing use (such as an office building or warehouse) was <br />rehabilitated to create five or more housing units. Eugene has not received any <br />th <br />applications for this type of activity. Nozama Apartments on 19 Avenue received a <br />MUPTE for a substantial rehabilitation when buildings that were a part of the former <br />Amazon Student Housing were relocated to the site. <br /> <br />How does staff monitor, after the fact, the need for each project’s “but for” <br />requirement? <br /> <br />Once a project is approved staff only monitors if the project is built and if it is <br />substantially the same as what was approved. At the time a MUPTE application is <br />submitted to the City the proposal is typically in an advanced conceptual state. The <br />developer presents a concept, basic drawings, and a financial pro-forma, but has not <br />submitted plans for building permits. The financial projections that are presented are <br />reviewed by staff that is knowledgeable about housing finance. Under the new standards <br />that are proposed, additional review would come from Eugene’s Loan Advisory <br />Committee. Once approved by Council, the developer proceeds with investing in the <br />more detailed design and permitting process with the knowledge that the tax exemption <br />has made the project feasible. If the development has a substantial change in plans it <br />would be a violation of the MUPTE approval and would need to come back to City <br />Council for re-approval. Examples of a substantial change would be a deviation in the <br />number of units by more or less than 10%, or adding additional floors. Less significant <br />changes are often inevitable during the design, building permit and inspection process. <br /> <br />