My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-21-56-F -- Corrected Regional WW and Parks SDCs
COE
>
City of Eugene
>
Administrative Orders
>
2021
>
Admin Order 58-21-56-F -- Corrected Regional WW and Parks SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2022 1:57:02 PM
Creation date
1/6/2022 1:56:43 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Order - Page 1 of 2 <br />ADMINISTRATIVE ORDER NO. 58-21-56-F <br />of the <br />City Manager of the City of Eugene <br /> <br />AMENDING CITY OF EUGENE SYSTEM DEVELOPMENT CHARGE <br />METHODOLOGIES, APPENDIX F "LOCAL SDC SYSTEM FORMULAS <br />AND GENERAL FEE SCHEDULE," TO CORRECT ERRORS IN <br />SYSTEMS DEVELOPMENT CHARGE INFLATIONARY ADJUSTMENTS <br />MADE BY ADMINISTRATIVE ORDER 58-21-21-F (REGIONAL <br />WASTEWATER SYSTEM AND PARKS AND RECREATION SYSTEM). <br /> <br />The City Manager of the City of Eugene finds as follows: <br /> <br />A. Section 2.020 of the Eugene Code, 1971 (EC), authorizes the City Manager of the <br />City of Eugene to determine and set fees and charges to be imposed by the City for services, goods, <br />use of municipal property, and licenses and permits. EC 7.710(5) and Section 2.4 of the Systems <br />Development Charge (SDC) Methodologies authorize the City Manager to adopt by administrative <br />order pursuant to EC 2.020, a change in the amount of a reimbursement fee or an improvement fee <br />if the change in amount is based on: (1) the periodic application of an adopted specific cost index <br />(inflationary adjustment); or (2) a modification to any of the factors related to rate that are <br />incorporated in the established methodologies, so long as the fees are not increased by more than <br />five percent within any 12-month period. <br /> <br />B. Section 2.4 and Appendix C-2 of the City of Eugene System Development Charge <br />Methodology provide for periodic inflationary adjustments to the SDC rates by applying the20- <br />city national average construction cost index published by Engineering News-Record (ENR) and <br />/ or the Lane County Assessor’s Office Certified Ratio Study (when adjusting the SDC for <br />acquisition costs of real property). <br /> <br />C. The Engineering News-Record 20-City National Average Construction Cost Index <br />is 2.96% (March 2020 through April 2021) and the Lane County Assessor’s Office Certified Ratio <br />Study shows that real property acquisition costs have increased by 7.52%. On these bases, the <br />2021 inflationary rate for Parks and Recreation SDCs is +2.46% and the 2021 inflationary rate for <br />the Regional Wastewater SDCs ranges from +1.953% to +1.62%, depending upon assigned <br />strength categories. <br /> <br />D. Administrative Order No. 58-21-21-F issued on June 25, 2021 was intended to <br />make the 2021 inflationary adjustments to the SDC rates for the Transportation, Local Wastewater, <br />Regional Wastewater, Stormwater and Parks and Recreation Systems, but the inflationary <br />adjustments for the Regional Wastewater and the Parks and Recreation Systems made by <br />Administrative Order No. 58-21-21-F were improperly calculated. <br /> <br />E. To correct the inflationary adjustments for the Regional Wastewater and the Parks <br />and Recreation Systems, on December 16, 2021, I issued Administrative Order No. 58-21-56 <br />ordering that Notice be given of the opportunity to comment on a proposal to correct the errors.
The URL can be used to link to this page
Your browser does not support the video tag.