My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-4/12/04WS
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-04/12/04WS
>
CCAgenda-4/12/04WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:27 PM
Creation date
4/9/2004 9:30:58 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
4/12/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· Implement a design study and possible acquisition of land to make a stronger <br /> pedestrian connection from 5th Avenue to the dverfront. <br /> <br />· Create a pedestrian connection across the railroad tracks between the end of <br /> Willamette Street and Skinner Butte. <br /> <br />· Provide a loan fund for faCade improvements along West Broadway. <br /> <br />· Include signs, public art and landscaping at the gateways to downtown along <br /> Broadway and Willamette. <br /> <br />· Begin site analysis of possible locations along East 8th Avenue for a new City <br /> Hall and police station. <br /> <br /> 19 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.