My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19816
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:05 PM
Creation date
11/14/2008 1:17:01 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19816
Document_Title
An ordinance levying assessments for paving, curb, gutters, sidewalks and traffic signal on Harlow Road from Garden Way to Interstate 5; and declaring an emergency.
Adopted_Date
12/2/1991
Approved Date
12/2/1991
CMO_Effective_Date
12/2/1991
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHiBfT Mfg:; <br />FINDINGS AND RECONIlyENDATIONS <br />SUBJECT: PAVING, CURB, GUTTERSr SIDEWALKS AND TRAFFIC SIGNAL ON <br />HARLOW ROAD FROM GARDEN WAY TO BEVERLY STREET <br />CONTRACT #91-13~ <br />BACKGROUND <br />The Harlow Road improvement project from Garden Way to Beverly <br />Street was identa.fied as a needed project in the City Council <br />adopted FY '91 capital budget. The project includes a traffic <br />signal at Garden Way along with bike, pedestrian and vehicular <br />improvements to the ramp leading to the overpass at Interstate 5. <br />Property owners were notified of the pending local improvement <br />district hearing 10 days prior to the hearing. The Local Improve- <br />ment District was formed by the City Council an June 10, 1991. The <br />low bid was submitted by Wildish Paving Co. for an amount of <br />$381,892.00. <br />PROJECT <br />The improvement includes the construction of a traffic signal at <br />Garden Way, the widening and construction of curb, gutter and <br />sidewalks on Harlow Road from Garden Way to Beverly Street in <br />Springfield and the widening of the bridge over Interstate 5. The <br />bridge widening will occur as a second phase in 1992 and has not <br />been included in the scope of this project. <br />ASSESSMENT <br />Six properties that abut Harlow Road will be assessed a portion of <br />the project cost. Two of the three properties on the north side <br />currently take direct access off Harlow Road with the third being <br />a Garner lot. On the south side, one is a corner lot and two take <br />primary access off Panda Loop but abut Harlow Road. Based on the <br />recommendations and findings of the hearings official and concur- <br />rence by the City Council, Tax Lot 17-03-25--11-00102 will be <br />assessed for a portion of its frontage, 70.67 feet. This reduction <br />is due to the preclusion of access by the required safety guard <br />rail. <br />Each of the six properties will be assessed for curb/gutter and <br />sidewalk and adjustment of existing driveways where appropriate. <br />Under City of Eugene assessment policy, equitable proportions of <br />the costs are assessed to the abutting property owners. The casts <br />
The URL can be used to link to this page
Your browser does not support the video tag.